MaksBuilder commercial project · Daikin rooftop unit · Lake Forest
When a 23-year-old rooftop unit stopped working because of a failed compressor and a leaking coil, the owners of a Lake Forest production facility needed cooling back without disrupting operations. We sourced a Daikin 10-ton commercial packaged heat pump, craned it onto the roof and had it running 2 days after the owners approved the job.
- 10 tons: Daikin commercial packaged heat pump
- 2 days: from approval to installation
- 23 years: old unit retired: compressor + coil failure
- No disruption: production kept running
The situation
A production facility in Lake Forest is cooled by rooftop packaged units. One of them, a 23-year-old 10-ton unit, stopped operating: the compressor had failed and the coil was leaking refrigerant. On equipment that old, replacing a compressor and a coil would cost a large share of a new unit and still leave the rest of a worn-out system in place. Downtime was the owners’ main concern. They run a production operation, so they needed the space cooled again quickly and the work done without interrupting their staff or their production schedule.
Our recommendation
We diagnosed the failure, explained the repair-versus-replace math, and the owners agreed to replace the unit with a new Daikin 10-ton commercial packaged rooftop heat pump.
- Right-sized replacement: same 10-ton capacity, matched to the existing ductwork and the space it serves.
- Heat pump: one unit for both cooling and heating, with lower-GWP refrigerant and modern efficiency, replacing a 23-year-old system.
- Curb adapter: a new galvanized curb adapter so the new unit fits the existing roof curb and duct openings without cutting the roof.
- Speed: we picked up the unit from the distributor, booked the crane and completed the replacement 2 days after the owners approved it.
The installation
- Picked up the new Daikin heat pump from the distributor ahead of installation.
- Disconnected the old unit’s electrical and other connections and prepared it for the lift.
- Crane lift: old unit lifted off the roof and new unit set in one visit, with the lift area coned off.
- Installed a new curb adapter on the existing roof curb, sealed to the curb and to the supply and return openings.
- Set and secured the new Daikin unit, then reconnected electrical through a new disconnect, plus the condensate drain and controls.
- Started up and commissioned the unit: checked refrigerant operating pressures, airflow, temperature split and safety controls, and confirmed the space was cooling.
- Hauled the old unit away and cleaned up the roof.
The result
The new unit was installed 2 days after approval, with no disruption to production. The owners replaced a 23-year-old unit that had failed for good with a new Daikin commercial heat pump that handles both cooling and heating, avoiding a costly repair on old equipment and getting a unit that should serve the building for many years.
Equipment summary
| Building | Production facility, Lake Forest |
|---|---|
| Replaced | 23-year-old 10-ton rooftop unit (failed compressor, leaking coil) |
| New equipment | Daikin 10-ton commercial packaged rooftop heat pump (cooling + heating) |
| Roof | New galvanized curb adapter on the existing curb; crane lift |
| Timeline | Installed 2 days after approval |
| Operations | No disruption to production |
Rooftop unit down at your business? MaksBuilder is a licensed HVAC contractor (CSLB #1095368) based in Foothill Ranch, replacing commercial rooftop units for offices, shops and production facilities in Lake Forest and South Orange County. Call (949) 740-0410 · maksbuilder.com